UK marine service – Energy Gurus https://www.energurus.com Marine, Offshore and Industrial Automation and Electrical Engineering Tue, 01 Sep 2020 14:31:07 +0000 en-GB hourly 1 https://wordpress.org/?v=5.5.5 Vattenfall Network Solutions teams up with Energy Gurus to provide CAPEX funded packages for decarbonisation of Propulsion Systems and Ports https://www.energurus.com/2020/07/vattenfall-network-solutions-teams-up-with-mjr-to-provide-capex-funded-packages-for-decarbonisation-of-propulsion-systems-and-ports/ https://www.energurus.com/2020/07/vattenfall-network-solutions-teams-up-with-mjr-to-provide-capex-funded-packages-for-decarbonisation-of-propulsion-systems-and-ports/#respond Fri, 17 Jul 2020 10:13:36 +0000 https://www.energurus.com/?p=1460   Energy Gurus has teamed up with Vattenfall Network Solutions to support the UK marine & Ports sector in the transition to net zero emissions. Energy Gurus will provide end to end system solutions and technology for both green & hybrid propulsion systems,  electrification of ports and harbours and onshore charging infrastructure with customer […]

The post Vattenfall Network Solutions teams up with Energy Gurus to provide CAPEX funded packages for decarbonisation of Propulsion Systems and Ports appeared first on Energy Gurus.

]]>

 

Energy Gurus has teamed up with Vattenfall Network Solutions to support the UK marine & Ports sector in the transition to net zero emissions. Energy Gurus will provide end to end system solutions and technology for both green & hybrid propulsion systems,  electrification of ports and harbours and onshore charging infrastructure with customer CAPEX finance packages provided by Vattenfall Networks Solutions.

Whilst the demand is increasing for reduction in emissions and energy consumption for vessel owners/operators and port side infrastructure, access to CAPEX funding is holding back the progress and implementation of green project solutions. In a bid to fast track the uptake of these proven technologies, Energy Gurus has teamed up with Vattenfall Network Solutions to remove some of these barriers by supplying “Power-as-a-Service” for both propulsion and port infrastructure for the decarbonisation of assets and equipment.

With Energy Gurus providing turnkey solutions and after sales support for electrification and hybrid systems coupled with Vattenfall Network Solutions complete ownership package that de-risks the life cycle cost with a fixed service fee, Energy Gurus and Vattenfall can provide a true end to end turnkey system solution .

For more information on how Energy Gurus can support you on this journey, please contact:

Email: ryan.reilly@energurus.com

Additional details:

Energy Gurus Hybrid & Electric Propulsion Q&A

Energy Gurus _Vattenfall Network Solutions – Green Propulsion aaS

Energy Gurus _Vattenfall Network Solutions – PaaS Ports

 

The post Vattenfall Network Solutions teams up with Energy Gurus to provide CAPEX funded packages for decarbonisation of Propulsion Systems and Ports appeared first on Energy Gurus.

]]>
https://www.energurus.com/2020/07/vattenfall-network-solutions-teams-up-with-mjr-to-provide-capex-funded-packages-for-decarbonisation-of-propulsion-systems-and-ports/feed/ 0
Stena Line selects Energy Gurus’s Marine Automation Platform MAP OE for Ballast Control System replacement https://www.energurus.com/2020/07/stena-line-selects-mjrs-marine-automation-platform-map-oe-for-ballast-control-system-replacement/ https://www.energurus.com/2020/07/stena-line-selects-mjrs-marine-automation-platform-map-oe-for-ballast-control-system-replacement/#respond Thu, 02 Jul 2020 15:19:45 +0000 https://www.energurus.com/?p=1474 Offshore Electrical Engineering supplier Energy Gurus was contracted by Stena Line for replacement of the their ballast control system on the Stena Scotia. With the existing tank gauging and valve remote control system obsolete and unsupportable by the manufacturers, Energy Gurus’s MAP OE System was selected for its off the self hardware, open software […]

The post Stena Line selects Energy Gurus’s Marine Automation Platform MAP OE for Ballast Control System replacement appeared first on Energy Gurus.

]]>

Energy Gurus’s Successful delivery of replacement Ballast, Freshwater, Fuel & Lube Oil, Tank Level Gauging and Control System.

Offshore Electrical Engineering supplier Energy Gurus was contracted by Stena Line for replacement of the their ballast control system on the Stena Scotia. With the existing tank gauging and valve remote control system obsolete and unsupportable by the manufacturers, Energy Gurus’s MAP OE System was selected for its off the self hardware, open software platform and ergonomic operators screen and the flexibility to install & commission with the vessel in-service.

The system provides remote tank gauging, controls all of the valves on the ship and provides fully automatic heeling control to maintain vessel trim during loading and unloading of cargo. The system also integrates with the vessels loading and stability computer, which was also renewed, providing it with tank volume data to enable the necessary shear force, bending moment and stability calculations to be carried out. With over 700 I/O points, the system is quite extensive and being an essential system requires a fully redundant continuously available architecture. The solution was perfect for Energy Gurus’s proven MAP-OE™ Integrated Machinery Automation & Control System as it was required to be delivered with full design approval from Lloyds Register of Shipping.

 

 

 

 

 

 

Managing Director Paul Cairns comments “Installing and commissioning a system of this size with the ship in service and without causing any vessel downtime was extremely difficult. The skill, flexibility and ingenuity of our engineering and installation team is second to none and I congratulate all involved in doing a great job”

Further details click here: Energy Gurus Stena Scotia Case Study

The post Stena Line selects Energy Gurus’s Marine Automation Platform MAP OE for Ballast Control System replacement appeared first on Energy Gurus.

]]>
https://www.energurus.com/2020/07/stena-line-selects-mjrs-marine-automation-platform-map-oe-for-ballast-control-system-replacement/feed/ 0
Energy Gurus Successfully Deliver Ships Complete Electrical Power, Propulsion, Dredging & Automation System Upgrade. https://www.energurus.com/2020/06/mjr-successfully-deliver-ships-complete-electrical-power-propulsion-dredging-automation-system-upgrade/ https://www.energurus.com/2020/06/mjr-successfully-deliver-ships-complete-electrical-power-propulsion-dredging-automation-system-upgrade/#respond Wed, 10 Jun 2020 11:17:52 +0000 https://www.energurus.com/?p=1372 Energy Gurus has successfully completed the life extension project of the dredging vessel Heortnesse owned and operated by PD Ports.   Energy Gurus delivered the complete electrical power, propulsion, dredging & integrated control, automation & monitoring system upgrade including  Lloyd’s class approval in an aggressive 7 month project schedule from design through to installation […]

The post Energy Gurus Successfully Deliver Ships Complete Electrical Power, Propulsion, Dredging & Automation System Upgrade. appeared first on Energy Gurus.

]]>
Energy Gurus has successfully completed the life extension project of the dredging vessel Heortnesse owned and operated by PD Ports.

 

Energy Gurus delivered the complete electrical power, propulsion, dredging & integrated control, automation & monitoring system upgrade including  Lloyd’s class approval in an aggressive 7 month project schedule from design through to installation and commissioning.

 

For a detailed case study, please click here :Energy Gurus Heortnesse Life Extension Case Study

 

 

 

A&P Group awarded Energy Gurus the contract in late September 2019 after an extensive competitive tender process against leading global marine companies for the design and replacement of the vessels entire diesel electric propulsion, dredging and automation plant.  Energy Gurus was contracted to deliver a complete turnkey package including engineering, procurement, installation & commissioning with full design approval by Lloyd’s Register of Shipping for the below scope of works:

 

  • Main & Auxiliary Propulsion Variable Speed Drive – 2 x 1.5MW + 1 x 500kW
  • Dredging Pump Variable Speed Drive – 1 x 1.2MW
  • Flushing Pump Starter – Upgrade to Soft Starting (500kW)
  • Dredging Control System
  • Main Hydraulic Power Unit Remote Control System
  • Diesel Engine/Generator Control & Protection Systems
  • Diesel Engine Instrumentation & Sensors
  • Machinery Alarm & Monitoring System
  • Bridge Navigation & Dredging Control Consoles
  • Engine Control Room Consoles
  • 24 VDC Automation Battery and Power Distribution System

 

 

The design, engineering and procurement was carried out during the 4th quarter of 2019 followed by the construction, automation and  FAT  during the early part of 2020 at Energy Gurus’s HQ in Stockton-on-Tees. Installation and commissioning teams completed the site works at A&P’s Tees docks, Middlesbrough during March 2020 and April followed by successful trials in May 2020. Due to the COVID-19 Pandemic and with new safety at work restriction and procedures  implemented, Energy Gurus were able to complete the installation and commissioning onsite and remotely using the newly installed remote access network combined with the features included in the Energy Gurus marine & automation platform, MAP-OE™.

 

 

 

 

 

 

 

 

 

 

At the heart of the system is Energy Gurus’s proprietary Marine Automation Platform, MAP-OE™ for Integrated Machinery Automation & Control which also has the capability to provide PD Ports with ongoing remote conditioning monitoring reporting as well as diagnostics and troubling shooting for any alarms or site issue. The system is accessed via secure remote access network from Energy Gurus’s onshore hub significantly reducing the mean time to repair and the cost to repair by limiting the requirement for engineers to attend the vessel.

 

Paul Cairns, Managing Director comments: “The life extension project for the PD Ports Heortnesse dredging vessel  was delivered from companies based in the North East of England which further demonstrates the capability and capacity to deliver major marine, offshore and renewable projects from the UK. Designing and retrofitting complex marine systems on this scale and with this level of complexity requires many years of experience and lessons learned. With tight timescales and no margin for error, right first time is the only option. The successful delivery of this project, despite the challenges with the COVID-19 pandemic further illustrates Energy Gurus’s growing reputation as the partner of choice for demanding marine projects in the UK and Globally.”

For a detailed case study, please click here: Energy Gurus Heortnesse Life Extension Case Study

The post Energy Gurus Successfully Deliver Ships Complete Electrical Power, Propulsion, Dredging & Automation System Upgrade. appeared first on Energy Gurus.

]]>
https://www.energurus.com/2020/06/mjr-successfully-deliver-ships-complete-electrical-power-propulsion-dredging-automation-system-upgrade/feed/ 0