Van Oord – Upgrade and Installation of Kongsberg IAS System

Energy Gurus Completes Successful Installation, Termination & Testing of over 2000 me-ters of Power, Communication & Fibre cables on board the MPI Resolution

Energy Gurus were contracted by Van Oord for the power and control cable upgrade of the Kongsberg ACON-R IAS project. The scope of work included the removal, supply, installation and testing of over 2000 metres of new marine power, ethernet and fibre optic cables

 

During the vessels dry dock in Rotterdam, Energy Gurus’s installation team carried out the site works in 2 weeks in-cluding the supply, installation and testing of:

  • 900mtrs of CAT5 Cable
  • 350mtrs of Fibre Optic Cable, spliced, terminated & OTDR Tested
  • Over 800mtrs of Power cables
  • Cable Containment with Old Transits Re-packed & New Transits Installed

 

For full case note, download here: MPI Resolution IAS System Upgrade