Energy Gurus were contracted by Van Oord for the power and control cable upgrade of the Kongsberg ACON-R IAS project. The scope of work included the removal, supply, installation and testing of over 2000 metres of new marine power, ethernet and fibre optic cables
During the vessels dry dock in Rotterdam, Energy Gurus’s installation team carried out the site works in 2 weeks in-cluding the supply, installation and testing of:
For full case note, download here: MPI Resolution IAS System Upgrade