Heortnesse Dredger Life Extension Project

Complete Electrical Power, Propulsion, Dredging & Integrated Control, Automation & Monitoring System Upgrade.

 

Awarder in 2019 by A&P group, Energy Gurus was contracted to deliver a complete turnkey package including engineering, procurement, installation & commissioning as follows:

  • Propulsion Variable Speed Drive & Remote Control System
  • Dredging Variable Speed Drive & Remote Control System
  • Hydraulic System
  •  Integrated Machinery Automation & Control System
  • Power Management System
  • Diesel Engine Supervision & Safety System
  • Bridge, Dredging & Engine Control Room Consoles

Engineering was carried out at Energy Gurus’s Teesside facility during the last quarter of 2019 including full design approval by Lloyds Register of Shipping with system build and FAT during the first quarter of 2020.

For full details, download our case note: Energy Gurus Heortnesse Life Extension Case Study