Projects – Energy Gurus https://www.energurus.com Marine, Offshore and Industrial Automation and Electrical Engineering Fri, 26 Mar 2021 10:07:44 +0000 en-GB hourly 1 https://wordpress.org/?v=5.5.5 Marine CCTV Systems for UK Largest Ferry Operator https://www.energurus.com/projects/marine-cctv-systems-for-uk-largest-ferry-operator/ Fri, 05 Mar 2021 08:13:47 +0000 https://www.energurus.com/?post_type=projects&p=1884 Energy Gurus has successfully delivered the complete design and installation of the new state-of-the-art marine CCTV system across four ferries for the UK’s largest ferry operator. The advanced CCTV systems have been installed on four ferries across yards in Scotland and the North of England in line with Ferry operators planned 2020/21 dry […]

The post Marine CCTV Systems for UK Largest Ferry Operator appeared first on Energy Gurus.

]]>
Energy Gurus has successfully delivered the complete design and installation of the new state-of-the-art marine CCTV system across four ferries for the UK’s largest ferry operator.

The advanced CCTV systems have been installed on four ferries across yards in Scotland and the North of England in line with Ferry operators planned 2020/21 dry docking schedule – with successful handover to on time and in budget. This included the design and installation of complete network  infrastructure with over 160 internal and external cameras with operator stations located in the bridge, ECR and purser office, and associated servers, and UPS’s.

The sophisticated CCTV system gives superior coverage and image quality with full and unrestricted views of both passenger and crew areas, and machine and cargo spaces   with up to 30 days’ worth of video storage. The advanced system has internal and external marine cameras with zoom and pan functions including full 360-degree cameras for complete coverage with functions available in real time or on pre-recorded videos. The new CCTV system gives enhanced security that is built to last in even the harshest of environments.

 

The post Marine CCTV Systems for UK Largest Ferry Operator appeared first on Energy Gurus.

]]>
Heortnesse Dredger Life Extension Project https://www.energurus.com/projects/heoetnesse-dredger-life-extension-project/ Wed, 16 Sep 2020 09:39:39 +0000 https://www.energurus.com/?post_type=projects&p=1808 Complete Electrical Power, Propulsion, Dredging & Integrated Control, Automation & Monitoring System Upgrade.   Awarder in 2019 by A&P group, Energy Gurus was contracted to deliver a complete turnkey package including engineering, procurement, installation & commissioning as follows: Propulsion Variable Speed Drive & Remote Control System Dredging Variable Speed Drive & Remote Control System Hydraulic System […]

The post Heortnesse Dredger Life Extension Project appeared first on Energy Gurus.

]]>
Complete Electrical Power, Propulsion, Dredging & Integrated Control, Automation & Monitoring System Upgrade.

 

Awarder in 2019 by A&P group, Energy Gurus was contracted to deliver a complete turnkey package including engineering, procurement, installation & commissioning as follows:

  • Propulsion Variable Speed Drive & Remote Control System
  • Dredging Variable Speed Drive & Remote Control System
  • Hydraulic System
  •  Integrated Machinery Automation & Control System
  • Power Management System
  • Diesel Engine Supervision & Safety System
  • Bridge, Dredging & Engine Control Room Consoles

Engineering was carried out at Energy Gurus’s Teesside facility during the last quarter of 2019 including full design approval by Lloyds Register of Shipping with system build and FAT during the first quarter of 2020.

For full details, download our case note: Energy Gurus Heortnesse Life Extension Case Study

The post Heortnesse Dredger Life Extension Project appeared first on Energy Gurus.

]]>
CalMac Ferries Main ACB & MCCB Upgrades Across Their Fleet https://www.energurus.com/projects/calmac-main-acb-mccb-upgrades-across-their-fleet/ Wed, 16 Sep 2020 09:26:23 +0000 https://www.energurus.com/?post_type=projects&p=1805 Energy Gurus have successfully replaced obsolete Terasaki MCCB & ACB’s with the new ABB marine certified EMAX2 and XT range across twelve ferries . Energy Gurus have completed the retrofit of new ABB Emax2 ACB’s and XT MCCB ranges on 12 of the CalMac ferries as part of their resilience program […]

The post CalMac Ferries Main ACB & MCCB Upgrades Across Their Fleet appeared first on Energy Gurus.

]]>
Energy Gurus have successfully replaced obsolete Terasaki MCCB & ACB’s with the new ABB marine certified EMAX2 and XT range across twelve ferries .

Energy Gurus have completed the retrofit of new ABB Emax2 ACB’s and XT MCCB ranges on 12 of the CalMac ferries as part of their resilience program across their fleet . During the September to March scheduled docking period, Energy Gurus’s Installation team removed the existing obsolete Terasaki breakers , modified busbars and installed new ABB ACB and MCCB breakers for main emergency , power and distribution boards including set-up and commission.

Energy Gurus provided the turnkey solution from design, engineering , modification , installation and commissioning of all new replacement breakers.

For further details, download our case note : CalMac Breaker Upgrades Case Note

The post CalMac Ferries Main ACB & MCCB Upgrades Across Their Fleet appeared first on Energy Gurus.

]]>
Stena Line Ballast System Controls Replacement https://www.energurus.com/projects/stena-line-ballast-system-controls-replacement/ Wed, 16 Sep 2020 09:16:41 +0000 https://www.energurus.com/?post_type=projects&p=1804 Successful delivery of replacement Ballast, Freshwater, Fuel & Lube Oil, Tank Level Gauging and Control System. The system provides remote tank gauging, controls all of the valves on the ship and provides fully automatic heeling control to maintain vessel trim during loading and unloading of cargo. The system also integrates with the vessels loading and […]

The post Stena Line Ballast System Controls Replacement appeared first on Energy Gurus.

]]>
Successful delivery of replacement Ballast, Freshwater, Fuel & Lube Oil, Tank Level Gauging and Control System.

The system provides remote tank gauging, controls all of the valves on the ship and provides fully automatic heeling control to maintain vessel trim during loading and unloading of cargo. The system also integrates with the vessels loading and stability computer, which was also renewed, providing it with tank volume data to enable the necessary shear force, bending moment and stability calculations to be carried out. With over 700 I/O points, the system is quite extensive and being an essential system requires a fully redundant continuously available architecture. The solution was perfect for Energy Gurus’s proven MAP-OE™ Integrated Machinery Automation & Control System as it was required to be delivered with full design approval from Lloyds Register of Shipping.

For full details, download our case note : Energy Gurus Stena Scotia Case Study

The post Stena Line Ballast System Controls Replacement appeared first on Energy Gurus.

]]>
CalMac Ferries Multi vessel Propulsion and Pitch Control System Upgrades https://www.energurus.com/projects/1796/ Wed, 16 Sep 2020 08:55:30 +0000 https://www.energurus.com/?post_type=projects&p=1796 As part of the multi vessel contract, Energy Gurus has just successfully completed replacement of  the propulsion control system on Calmac Ferries Caledonian Isles. Completed in just over 14 days from start to finish and with over 3000 metres of new cabling and transits installed, the project was  delivered on time and to specification For full […]

The post CalMac Ferries Multi vessel Propulsion and Pitch Control System Upgrades appeared first on Energy Gurus.

]]>
As part of the multi vessel contract, Energy Gurus has just successfully completed replacement of  the propulsion control system on Calmac Ferries Caledonian Isles.

Completed in just over 14 days from start to finish and with over 3000 metres of new cabling and transits installed, the project was  delivered on time and to specification

For full details, download  our case note :CalMac Propulsion and Pitch Control Upgrade

The post CalMac Ferries Multi vessel Propulsion and Pitch Control System Upgrades appeared first on Energy Gurus.

]]>
JDR Cables HLM & VLM Power & Automation Upgrade https://www.energurus.com/projects/jdr-cable-s-hlm-vlm-power-automation-upgrade/ Wed, 16 Sep 2020 08:47:32 +0000 https://www.energurus.com/?post_type=projects&p=1795 Energy Gurus carried out extensive upgrades on JDR’s two main production lines at their Hartlepool Victoria Quay Manufacturing Plant. These technically challenging turnkey projects, executed to strict deadlines and demanding technical specifications involved replacement of all obsolete variable speed drive systems and delivery, installation and commissioning of a new centralised PLC control system (Siemens S7-1500) and […]

The post JDR Cables HLM & VLM Power & Automation Upgrade appeared first on Energy Gurus.

]]>
Energy Gurus carried out extensive upgrades on JDR’s two main production lines at their Hartlepool Victoria Quay Manufacturing Plant.

These technically challenging turnkey projects, executed to strict deadlines and demanding technical specifications involved replacement of all obsolete variable speed drive systems and delivery, installation and commissioning of a new centralised PLC control system (Siemens S7-1500) and Datalogger.

Offering unprecedented improvements in process performance, enhanced productivity and reliability these projects are a great example of Energy Gurus’s key skills in the retrofit, refit and upgrade market.

With the HLM being one of the world’s largest umbilical manufacturing lines and the largest in Europe, Energy Gurus were honoured to be trusted with such a critical project and didn’t disappoint!

 

The post JDR Cables HLM & VLM Power & Automation Upgrade appeared first on Energy Gurus.

]]>
Van Oord – Upgrade and Installation of Kongsberg IAS System https://www.energurus.com/projects/van-oord-upgrade-and-installation-of-kongsberg-ias-system/ Wed, 16 Sep 2020 08:24:14 +0000 https://www.energurus.com/?post_type=projects&p=1793 Energy Gurus Completes Successful Installation, Termination & Testing of over 2000 me-ters of Power, Communication & Fibre cables on board the MPI Resolution Energy Gurus were contracted by Van Oord for the power and control cable upgrade of the Kongsberg ACON-R IAS project. The scope of work included the removal, supply, installation and testing […]

The post Van Oord – Upgrade and Installation of Kongsberg IAS System appeared first on Energy Gurus.

]]>
Energy Gurus Completes Successful Installation, Termination & Testing of over 2000 me-ters of Power, Communication & Fibre cables on board the MPI Resolution

Energy Gurus were contracted by Van Oord for the power and control cable upgrade of the Kongsberg ACON-R IAS project. The scope of work included the removal, supply, installation and testing of over 2000 metres of new marine power, ethernet and fibre optic cables

 

During the vessels dry dock in Rotterdam, Energy Gurus’s installation team carried out the site works in 2 weeks in-cluding the supply, installation and testing of:

  • 900mtrs of CAT5 Cable
  • 350mtrs of Fibre Optic Cable, spliced, terminated & OTDR Tested
  • Over 800mtrs of Power cables
  • Cable Containment with Old Transits Re-packed & New Transits Installed

 

For full case note, download here: MPI Resolution IAS System Upgrade

The post Van Oord – Upgrade and Installation of Kongsberg IAS System appeared first on Energy Gurus.

]]>
Havilla Phoenix Power, Electrical and Controls Upgrade Project https://www.energurus.com/projects/havilla-phoenix-power-electrical-and-controls-upgrade-project/ Wed, 16 Sep 2020 08:14:02 +0000 https://www.energurus.com/?post_type=projects&p=1790 Extensive electrical power systems upgrade for DeepOcean’s multi-role offshore construction vessel Havilla Phoenix Energy Gurus provided turnkey design and project management services with Energy Gurus Electrical Engineers spending five months working between DeepOcean’s Darlington office and Leirvik assisting DeepOcean’s engineering team and overseeing the ship yard in carrying out the electrical conversion work.   Power Distribution System […]

The post Havilla Phoenix Power, Electrical and Controls Upgrade Project appeared first on Energy Gurus.

]]>
Extensive electrical power systems upgrade for DeepOcean’s multi-role offshore construction vessel Havilla Phoenix

Energy Gurus provided turnkey design and project management services with Energy Gurus Electrical Engineers spending five months working between DeepOcean’s Darlington office and Leirvik assisting DeepOcean’s engineering team and overseeing the ship yard in carrying out the electrical conversion work.

 

  • Power Distribution System Design for 3.3kV, 1kV, 690V, 440V, 230V & 110V Networks
  • Load Analysis
  •  Short Circuit Calculations
  •  Protection Studies including Selectivity and Co-ordination Analysis
  • Design of Clear-Coms, Data, CCTV, Lighting & Fire Detection Systems
  • Design and specification of Power Management Systems Interface to Deck Equipment Heavy Consumers
  • Design of Cable Management Systems, Cable Penetrations Cable Schedules
  • DNV.GL approval and certification of all modifications.

Paul Cairns, Managing Director  says:

“Electrical power systems upgrades on sophisticated diesel electric, dynamically positioned vessels on this scale require extensive experience.
Taking large amounts of power from the vessel to power back deck and subsea equipment can affect operability of the vessel and unless
designed and planned carefully can adversely affect vessel performance. Also gaining class approval for such modifications is not a trivial matter
and requires an in depth knowledge of vessel power generation, networks and power management systems. The successful delivery of the
project further demonstrates Energy Gurus’s extensive capabilities in the Offshore Electrical power engineering field”

For full case note please download here Havilla Phoenix Upgrade Project

The post Havilla Phoenix Power, Electrical and Controls Upgrade Project appeared first on Energy Gurus.

]]>
500kW Micro-grid Power Conversion System https://www.energurus.com/projects/500kw-micro-grid-power-conversion-system/ Mon, 20 Jul 2020 08:12:43 +0000 https://www.energurus.com/?post_type=projects&p=1575 Energy Gurus has design, constructed & Installed a 500kW Floating Offshore Power Conversion System DG500 Tidal Energy Converter  deliver’s and dissipate generated energy at the offshore test site as if connected to an onshore grid. The bespoke system is based on ABB’s industry ACS880 drive hardware platform modules engineered into a unique system architecture that allows […]

The post 500kW Micro-grid Power Conversion System appeared first on Energy Gurus.

]]>
Energy Gurus has design, constructed & Installed a 500kW Floating Offshore Power Conversion System

DG500 Tidal Energy Converter  deliver’s and dissipate generated energy at the offshore test site as if connected to an onshore grid.

The bespoke system is based on ABB’s industry ACS880 drive hardware platform modules engineered into a unique system architecture that allows bi-directional low harmonic energy transfer, complete with an energy storage system for periods when the device is not generating.

Energy Gurus’s scope of supply included the design of power conversion system to enable stable power injection from the DG500 device via umbilical into 500kW dummy load; power management system, 70kWh energy storage system, interface with spar buoy auxiliary systems, PLC and SCADA system houses in a 20ft offshore container.

The post 500kW Micro-grid Power Conversion System appeared first on Energy Gurus.

]]>
Modular Containerised Power & Control System for Offshore Pipelay System https://www.energurus.com/projects/modular-containerised-power-control-system-for-offshore-pipelay-system/ Thu, 09 Jul 2020 16:56:31 +0000 https://www.energurus.com/?post_type=projects&p=1514 Energy Gurus Deliver Containerised Power & Control System for a 4000Te Carousel and Tensioner System

The post Modular Containerised Power & Control System for Offshore Pipelay System appeared first on Energy Gurus.

]]>
Energy Gurus Deliver DNV-GL2.7-1 Containerised Power & Control System 4000Te Carousel and Tensioner System

Working in close partnership with our Client, who is a valued repeat customer of Energy Gurus of over 10 years, Energy Gurus will deliver a Containerised Electric Drive & Control System based on ABBs industry leading ACS880 drive hardware platform.

The project comprises the construction of a modular Containerised Power & Control System for a 4000Te Carousel and Tensioner System with a of supply including: bespoke DNV2.7-1 Offshore Drive & Control Containers; Drive Switchboards; MCCs; Active Harmonic Filters; Control Desks; HVAC; CCTV; Fire Detection & Suppression; Data; Communications and Vessel Interface.

With an accelerated delivery schedule and challenging technical requirements, the project is an example of Energy Guruss trusted ability to deliver fast track innovative projects to the offshore industry.  

The post Modular Containerised Power & Control System for Offshore Pipelay System appeared first on Energy Gurus.

]]>