Maersk Responder was delivered in 2000 as a Cable Installation Vessel and later converted to a Multipurpose Offshore Construction Vessel.
During this conversion all of the Hydralift cable installation deck machinery was decommissioned, removed and put into long term storage together with its associated control systems.
Substantial modifications were then made to the vessels electrical power distribution, data, communications, surveillance and control systems to prepare the vessel for her new role.
During 2008 the vessel was converted to her original configuration and the Hydralift cable machinery was reinstalled and re-commissioned over a 3 week refit period.
Energy Gurus carried out the entire electrical power, data, communications, surveillance, and control workscopes including…
The re-installation was carried out in such a way that eventual demobilisation could be achieved rapidly and the vessel could be restored to a Multipurpose Offshore Construction role quickly.
This complex and heavily time constrained project is a great example of our diverse range of technical and project management skills, from software engineering to high power electrical systems and clearly demonstrates our ability to deliver complex turkey projects effectively.