Safe and successful installation of 450Te Pipelay System
Energy Gurus have safely and successfully completed a large scale mobilisation project for McDermott on time and with no injuries.
The 450Te Pipelay System was installed aboard the new-build Lay Vessel North Ocean 105 Offshore Construction Vessel.
Work included:
- Mobilisation of back deck equipment including 1200 tonne,52m pipe-lay tower, 40ft drive cabinet container, 20ft control container, 40ft HPU container, 20ft workshop. Installation of all power and communications connections between these.
- Installation of CCTV, clear comms, DP alert and survey systems throughout the vessel.